Application scenarios: The temperature and humidity of a natural gas boiler exhaust in hangzhou energy company are large, resulting in a large number of white smoke plume at the chimney mouth.
Treatment scale: The flue gas volume is 45000Nm³/h and the flue gas temperature is 60℃.
Transformation technology: Adopt "superconducting endothermic + condensation + superconducting exothermic" whitening technical route
Construction scope: Including system design, equipment supply, on-site installation and debugging, EPC project of whitening system (excluding civil construction)
Plume elimination: Annual plume elimination rate is 100%
Waste heat recovery: After the transformation, the system recovered 620kW heat load, converted down to save 62Nm³ of natural gas per hour
Pictures show: Shut down and open chimney No. 1 whitening system
Bleaching of flue gas of mixer in asphalt plant
Boiler flue gas bleaching
Bleaching of molding machine flue gas
Coking flue gas bleaching
Primary air preheating of boiler
Flue gas waste heat heating demineralized water
Heating oven exhaust air
Dyeing wastewater heating dyeing tank water
Phase change condenser
Natural gas heater
SGH steam heater
High viscosity gas-liquid heater
Drive type air cooler
High efficiency air preheater
High efficiency waste heat recovery device